Custom Engineered Floor Crane Speeds Glass Installation



A specially modified RG-FP2000R-CB was engineered for this customer to improve its ability to set architectural glass. The unit has tremendously increased productivity; with a 300% efficiency increase with 1/3 the crew.

< Back to Case Studies